Description
Complete installation pack containing everything required for connection of your heating system.
Controlled by a Safety RCD to offer maximum protection.
This pack is designed for installation onto block/brick walls – for installation onto dry lined/plaster board walls select ‘Safety RCD Control Installation Pack – dry lined walls’.
Pack includes:
Safety RCD Fused Spur
28 mm Deep Flush box (for spur)
35 mm Flush box (for thermostat)
20 mm Conduit (for linking between flush boxes)
10 mm Conduit for floor probe (if not included in kits)